PRECAST PUMP

STZW Series integrated prefabricated pump station

Integrated precast pumping station

With the rapid development of domestic urban construction, domestic and production sewage has gradually affected our production and life. It is very difficult to discharge the sewage in the area where the sewage pipe is lower than the municipal pipe network or far away from the municipal main pipe network. And the long-term detention of sewage will have a greater impact on the overall environment. The WZ series integrated prefabricated pumping station of Santong can effectively solve the problems in sewage discharge and treatment. It can quickly and effectively deliver the sewage to the designated sewage treatment plant, so as to eliminate the impact of long-term detention of sewage and rainwater on the environment.

 

Discharge medium: domestic sewage, industrial wastewater, rainwater, drainage, source water.

图片名称
图片名称
图片名称

Application area

The products are widely used in minerals, construction, metallurgy, chemical industry, breeding, refrigeration, fire-fighting, sewage treatment and other fields.

Urban rainwater

Drainage of rainwater

Highway passenger station

Product advantag

Short cycle

图片名称

High integration

图片名称

Long service life

图片名称
图片名称
图片名称

Short cycle

图片名称

High integration

图片名称

Long service life

图片名称

Highly Ai

图片名称

Customized on demand

Model description

图片名称

Structure diagram

图片名称

Product configuration

Barrel, blowdown pump Grille system Level control system Ventilation and automatic Safety system Remote monitoring system
图片名称

Cylinder

图片名称

Sewage pump

图片名称
图片名称
图片名称
图片名称
图片名称
图片名称
图片名称
图片名称

Centralized management of databaseand network server

Process

01

Determining pump flow and lift

02

The height of the cylinder head and the height of the inlet / outlet are determined.

03

Calculate the minimum effective volume of pump station and estimate the cylinder

04

Selection of pump and determination of pump operation mode

05

Determine the inlet / outlet diameter of the pump station

06

Selection of pump station function, accessories material, brand and control system components

07

Complete the selection and configuration of pump station

Product notes

图片名称

Transport

During the transportation of the pump station, it must be placed horizontally and fixed on the truck with soft rope. The connection between the soft rope and the cylinder must be fixed with steel wire rope prohibited. It is forbidden to place heavy objects on the upper part of pump station barrel.

图片名称

Hoisting

Before the pump station is put into the foundation pit, the horizontal surface of the concrete foundation must be free from inclination, otherwise the tank body will be broken and the liquid inside the pump station will leak. When the pump station is hoisted into the foundation pit, all lifting lugs shall be used for hoisting, and each lug shall be evenly stressed. Pay attention to the alignment of inlet and outlet during hoisting.

图片名称

Fixed

Lift the pump station from the working area to the concrete base plate, and then install the fixed pressing plate. The fixed pressing plate is installed on the conical plate at the bottom of the prefabricated pump station with a certain diameter, and fixed with the expansion bolt and pressing plate.

图片名称

Grouting

It is recommended to use cement concrete with grade no less than C30 strength and gravel diameter no more than 32mm. During grouting, the bottom of the barrel shall be mixed to ensure that the concrete can evenly distribute the bottom of the barrel and fill all the voids. After grouting, it is necessary to observe the settlement of the concrete floor for 24 hours. In case of any settlement, it is necessary to inform the relevant staff in time and take remedial measures.

图片名称

Backfill

Backfilling shall be carried out evenly all around. It is forbidden to pour backfill materials directly to one side of the foundation pit.

The backfill material shall not contain dynamic soil, expansive soil or corrosive soil, and shall be compacted in layers.

The backfill shall be compacted to avoid the pipeline tension inside the pump station acting on the external pipeline.

It is strictly prohibited for large stones to fall into the backfill pit, so as to avoid damage to the barrel caused by falling on the barrel of the pump station.

图片名称

Debugging

Before commissioning and maintenance personnel operate the integrated prefabricated pump station, please read the installation and operation instructions of the integrated prefabricated pump station provided by our company carefully. And make sure that your debugging and maintenance personnel operate in strict accordance with the company's operating instructions. To ensure that you can use the product safely and effectively.